With five weeks to go in the build programme, Bart Sobieszczanski updates on progress at the London Design and Specification Centre.

Hump Day – Things are Getting Serious

Crossed the halfway point on our 10-week build schedule; with less than five weeks left things are getting serious, or seriously stressful one would say. BTW where is everyone?

whereiseverone Found 2

Found 2 so far, better building then looking at plans wondering what next I guess…

heretheyare Little IT Challenge

I really feel for our Ideal Standard IT team, we have designed in dozens of screens, Virtual Reality Pod, and other stuff to make their life rather difficult. 🙂

itchallege The Grand Staircase & The Grand Construction

After weeks on the site, I’m still amazed with the grand open staircase, but less and less with grand amount of construction work.

grandconstruction Clerkenwell Design Week Collaboration

Pleasure to join the top design duo collaboration on CDW2019. Roberto Palomba our new Creative Director and Robin Levien RDI join forces to help us deliver little sneak preview show. Katie still keeps the eye on all we do

collab 76 Clerkenwell Road Covered in Style

Temporary works manifestation went up. Super CHIC!

coveredinstyle